The main goal of retail layout is


A) minimizing material handling cost.
B) maximizing high-margin sales.
C) minimizing storage costs.
D) minimizing space required.
E) maximizing profitability per square foot of floor space.

F) None of the above
G) A) and E)

Correct Answer

verifed

verified

________ refers to the physical surroundings in which a service takes place,and how they affect customers and employees.

Correct Answer

verifed

verified

Servicescape refers to the physical surrounding in which the service is delivered.

A) True
B) False

Correct Answer

verifed

verified

Cyclone Appliances has developed a new European-style convection oven that will be made on an assembly line.The schedule requires 80 ovens in an 8-hour day.The assembly includes seven tasks.The table below indicates the performance time and the sequence requirements for each task. Cyclone Appliances has developed a new European-style convection oven that will be made on an assembly line.The schedule requires 80 ovens in an 8-hour day.The assembly includes seven tasks.The table below indicates the performance time and the sequence requirements for each task.    a.What is the cycle time for this assembly operation? b.What is the theoretical minimum number of workstations? c.Draw the precedence diagram. a.What is the cycle time for this assembly operation? b.What is the theoretical minimum number of workstations? c.Draw the precedence diagram.

Correct Answer

verifed

verified

(a)The cycle time is 480 minutes per day...

View Answer

In a product-oriented layout,the process of deciding how to assign tasks to workstations is referred to as


A) station balancing.
B) process balancing.
C) task allocation.
D) line balancing.
E) work allocation.

F) A) and D)
G) C) and D)

Correct Answer

verifed

verified

What is the primary reason why retailers tend to locate high-draw items around the periphery of the store?


A) More shelf space for those popular items is available around the periphery.
B) There will be less congestion of customers than there would be in the middle.
C) This arrangement will help to maximize customer exposure to other items in the store.
D) It is easier to put large advertisement signs on the outside walls right next to the items.
E) This arrangement allows customers to travel through the store as quickly as possible.

F) D) and E)
G) A) and B)

Correct Answer

verifed

verified

A disadvantage of product-oriented layout is that


A) there is a lack of flexibility in handling a variety of products or production rates.
B) high volume is required because of the large investment needed to set up the process.
C) work stoppage at any one point halts the whole operation.
D) All of the above are disadvantages of product-oriented layouts.
E) None of the above are a disadvantage of product-oriented layouts.

F) All of the above
G) A) and D)

Correct Answer

verifed

verified

An airport is trying to balance where to place three airlines.The distance between terminals and the number of trips that travelers make between airlines per day are listed.Find the assignment that minimizes the distance travelers must walk. An airport is trying to balance where to place three airlines.The distance between terminals and the number of trips that travelers make between airlines per day are listed.Find the assignment that minimizes the distance travelers must walk.

Correct Answer

verifed

verified

There are 6 possible assignments and the...

View Answer

Which layout's main objective is to equalize the task time for each station?


A) work cell
B) fixed position
C) process oriented
D) job shop
E) product oriented

F) A) and C)
G) A) and B)

Correct Answer

verifed

verified

An assembly line consists of 158 tasks grouped into 32 workstations.The sum of all task times is 105 minutes.The largest assigned cycle time is 4 minutes.The efficiency of this line is approximately


A) 8%.
B) 21%.
C) 82%.
D) 100%.
E) 158%.

F) D) and E)
G) A) and B)

Correct Answer

verifed

verified

A(n)________ is a special product-oriented arrangement of machines and personnel in what is ordinarily a process-oriented facility.

Correct Answer

verifed

verified

Hemo-tech,Inc. ,a biomedical technology and research laboratory,produces a standard blood filtering device on an assembly line basis.Six basic tasks are performed along an assembly line.The time to perform each task and the tasks that must immediately precede each task are in the table below.Twenty pumps per 450-minute day must be produced by the assembly line. Hemo-tech,Inc. ,a biomedical technology and research laboratory,produces a standard blood filtering device on an assembly line basis.Six basic tasks are performed along an assembly line.The time to perform each task and the tasks that must immediately precede each task are in the table below.Twenty pumps per 450-minute day must be produced by the assembly line.    a.Draw the network diagram of the precedence relationships. b.Identify the absolute minimum and maximum cycle times. c.How many workstations are required to meet the schedule? d.What is the cycle time required to meet demand? e.Balance this line using most following tasks heuristic. f.What is the efficiency of the line obtained in part e? g.Can the efficiency of this solution be improved? Explain. a.Draw the network diagram of the precedence relationships. b.Identify the absolute minimum and maximum cycle times. c.How many workstations are required to meet the schedule? d.What is the cycle time required to meet demand? e.Balance this line using most following tasks heuristic. f.What is the efficiency of the line obtained in part e? g.Can the efficiency of this solution be improved? Explain.

Correct Answer

verifed

verified

(a)The appropriate diagram appears below...

View Answer

Heuristics are problem-solving procedures that mathematically optimize the solution.

A) True
B) False

Correct Answer

verifed

verified

Retail layouts thrive on the notion that


A) handling costs should be minimized.
B) storage costs should be minimized.
C) average customer visit duration should be maximized.
D) space used should be minimized.
E) maximizing customer exposure rate maximizes sales and profit.

F) A) and E)
G) A) and B)

Correct Answer

verifed

verified

A company is trying to balance production between 3 workstations on an assembly line.Currently there are 5 tasks that need to be performed.These tasks,ABCDE,have required times of 2 minutes,4 minutes,1 minutes,3 minutes,and 10 minutes respectively.The assembly line needs to produce 40 units per day to meet demand and can work for up to 8 hours each day. A.What is the required cycle time? B.What is the theoretical minimum # of workstations? C.Assign the tasks according to shortest task time. D.Is there a better way to divide the work than in Part C?

Correct Answer

verifed

verified

Required cycle time = Production time av...

View Answer

McDonald's "Made for You" kitchen system represents a strategic layout decision even though an obvious benefit of the system is a dramatic reduction in the inventory of food prepared in advance.

A) True
B) False

Correct Answer

verifed

verified

An assembly line consists of 21 tasks grouped into 5 workstations.The sum of the 21 task times is 85 minutes.The largest assigned cycle time is 20 minutes.The efficiency of this line is


A) 4.2%.
B) 17%.
C) 85%.
D) 100%.
E) 126%.

F) B) and E)
G) C) and D)

Correct Answer

verifed

verified

The concept of customizing in a warehouse layout


A) is possible,but causes serious loss of oversight of the quality function.
B) cannot be considered seriously in today's high efficiency factories.
C) is theoretically sound,but several years away in practice.
D) is a new trend in value-added activities in warehouses.
E) does not support competitive advantage.

F) A) and E)
G) A) and B)

Correct Answer

verifed

verified

An insurance claims processing center has six work centers,any of which can be placed into any of six physical departmental locations.Call the centers 1,2,3,4,5,and 6,and the departments A,B,C,D,E,and F.The current set of assignments is A-3,B-1,C-6,D-2,E-4,and F-5. The (symmetric)matrix of departmental distances,in meters is An insurance claims processing center has six work centers,any of which can be placed into any of six physical departmental locations.Call the centers 1,2,3,4,5,and 6,and the departments A,B,C,D,E,and F.The current set of assignments is A-3,B-1,C-6,D-2,E-4,and F-5. The (symmetric)matrix of departmental distances,in meters is    The matrix of work flow (estimated trips per day)is among centers    The firm estimates that each trip costs approximately $4. a.What is the cost of the current assignment? b.Use trial-and-error to find one improved assignment. c.What is that assignment,and what is its cost? The matrix of work flow (estimated trips per day)is among centers An insurance claims processing center has six work centers,any of which can be placed into any of six physical departmental locations.Call the centers 1,2,3,4,5,and 6,and the departments A,B,C,D,E,and F.The current set of assignments is A-3,B-1,C-6,D-2,E-4,and F-5. The (symmetric)matrix of departmental distances,in meters is    The matrix of work flow (estimated trips per day)is among centers    The firm estimates that each trip costs approximately $4. a.What is the cost of the current assignment? b.Use trial-and-error to find one improved assignment. c.What is that assignment,and what is its cost? The firm estimates that each trip costs approximately $4. a.What is the cost of the current assignment? b.Use trial-and-error to find one improved assignment. c.What is that assignment,and what is its cost?

Correct Answer

verifed

verified

(a)The current assignment costs 14,000 m...

View Answer

What is cross-docking? Why is it appropriate for some forms of warehouse layout?

Correct Answer

verifed

verified

Cross-docking avoids placing materials o...